Oberoi Commerz II

Project Details
Successful completion 320MT of Strutting works for strengthening of Retaining wall, covering 4 Floor level.
-
Client
Oberoi Commerz II -
Our Role
Strutting required by client as the Old structure had to be demolished as per the new design and building. -
Location
Mumbai
Project Summery
Oberoi Commerz II – Strutting Works for Retaining Wall
JP Industries successfully delivered 320 MT of precision-engineered strutting works across four floor levels to support the retaining wall at the Oberoi Commerz II site in Mumbai.
Overview & Challenge
The project involved structural reinforcement as part of a major redevelopment initiative. The client required the demolition of an existing structure, which necessitated temporary but robust support for the retaining wall during the transition. Working in a densely populated urban environment added logistical and safety challenges, with strict timelines and structural integrity being critical.
Solution & Results
JP Industries Designed and executed a tailored strutting system, using 320 MT of fabricated steel to ensure full support over four floor levels. All works were completed in compliance with stringent safety and quality standards. The result was a stable and secure site, allowing for safe demolition and redevelopment activities without compromising surrounding structures. The project highlights JP Industries’ expertise in complex structural support systems and its ability to deliver under demanding site conditions.