Makutano Bridge Tanroads

Project Details
Makutano Bridge Design & Build for over a river for TANROADS
-
Client
Makutano Bridge,Tanzania -
Our Role
Design and Build of Makutano bridge over river for TANROADS, total tannage 220 MT -
Location
Tanzania, Africa
Project Summery
JP Industries successfully designed and fabricated the Makutano Bridge in Tanzania, delivering a 65-meter-long steel structure with a total tonnage of 220 MT for the Tanzania National Roads Agency (TANROADS).
Overview & Challenge
The project required the construction of a robust bridge over a river to improve regional connectivity in Tanzania. Key challenges included logistics coordination across international borders, adherence to TANROADS’ stringent specifications, and ensuring structural stability across a 65-meter span in a remote setting. Efficient project management and precise execution were crucial to overcoming time and resource constraints.
Solution & Results
JP Industries provided a complete design-and-build solution, fabricating and delivering 220 MT of high-strength steel for the bridge superstructure. The bridge was engineered for long-term durability and optimal load-bearing performance. By successfully executing the project, JP Industries contributed to critical infrastructure development in the region, demonstrating its capacity for international project delivery and large-span bridge fabrication under challenging conditions.